House of Pissa

Tuesday, 3 September 2013

Excavation looking good

Main excavation is almost done, now waiting for the geologic testing for the soil



 



Posted by ZePissa at 09:11
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2014 (36)
    • ►  April (2)
    • ►  March (3)
    • ►  February (16)
    • ►  January (15)
  • ▼  2013 (86)
    • ►  December (15)
    • ►  November (25)
    • ►  October (16)
    • ▼  September (13)
      • Late Late Late
      • Apostille
      • Some changes - 3D
      • Geo Study results
      • Sun "journey"
      • Skylights - natural light
      • Geo Study completed
      • Excavation Completed
      • Updated Benfica wall
      • Pool Design
      • Geologic Study
      • Excavation looking good
      • Level 1 floor change - master suite closet
    • ►  August (17)

About Me

My photo
ZePissa
View my complete profile

Total Pageviews

Simple theme. Powered by Blogger.